Live Projects

We are one of the North West of England and North Wales' leading names in construction and development.
For over 80 years, our projects have carried the Pochin name and been the flagbearer for our business. Today, we have a wide range of projects across the region, providing each with the exceptional quality and speed of delivery we've become known for.

Filter through our live construction and property projects to see the next exciting development to join the Pochin portfolio.

Filter your result by:

Copper Beeches

Copper Beeches - Sandbach

Design and Build contract for the construction of three number five bedroom detached houses and new private road / driveways.
The Client bought the existing Wilkinson House site and demolished the outbuildings to leave a clear site to enable construction to begin.The houses will be constructed utilising structural timber frame, beam and block flooring, outer skin of facing brick with Marley Eternit Thrutone Fibre cement slate for the roof.

Wilkinson House itself will be refurbished to create a luxury seven-bedroom dwelling.

Eaton Point

Eaton Point - Chorley


Construction of two new Industrial Buildings, at Eaton Avenue, Buckshaw Chorley.

This is our second success with Chancerygate in the North West, after the successful negotiation of this scheme and the DPD Development at Chadderton.

The Project comprises circa 40,000 sq ft of warehouse and welfare over two floors. The Units are to be sub divided creating 8 starter Units and One larger unit for local business who are re-locating.

This is a Steel frame construction with a cladding façade on ground that will be improved with vibro compaction along with Internal mezzanine’s and minimal fit out.

External works and drainage including 4 nr Car Charging points.

Completion due for June 2018

Project Toucan

Project Toucan - Reaseheath College, Nantwich


The project involves the design and construction of 200 bed student accommodation within 25 separate dwellings/units over 5 blocks. Each unit provides six, eight and 10-bedroom new-build townhouses on the campus.

Each of the two and three-storey townhouses will feature communical and dining areas, a kitchen and shared bathroom facilities to promote shared living among students aged 16 and over. The project is programmed to take 62 weeks (and started on site on the 2nd October)

As with the other projects (Osprey and Redkite) this will be delivered to BIM Level 2.

Projects Osprey & RedKite

Projects Osprey & RedKite - Reaseheath College, Nantwich


The scheme involves two projects for Reaseheath College, Project Osprey and Project RedKite.

Project Osprey involves the construction of a new multi-purpose Sports Hall building. The Sports Hall is to include space for up to five different court sports and trampoline activities. The Sports Hall will also be designed to cater for exams, presentation evenings and as a community facility. The building consists of a dual-height sports hall attached to a single-storey extension with associated dry and wet changing rooms, shower and toilet areas, Physio / First Aid room, laundry room and store rooms, with a total build cost of £3.3m

Project RedKite involves the construction of a new Agri-Tech Centre with teaching facilities and associated workshops, a two-storey teaching block and a neighbouring single-storey workshop building. The teaching block includes ground floor classrooms, offices, a meeting room and toilet facilities along with a dual height Showroom area. The first floor includes a large space for future use and a Plant Room, with a total build cost of £3.2m

Both projects will be a delivered to BIM Level 2.

City Gardens

City Gardens - Manchester


109 no apartments over 10 floors ranging from 1 to 3 beds.  The top 3 floors are triplex apartments. The project includes basement car parking.

The scheme also provides communal roof gardens to the 8th floor.

Construction includes CFA Piling with a steel frame and insitu concrete slabs to the 2nd floor with a lightweight steel frame and insitu slabs above.

External soft and hard landscaping is created to the surrounding areas.

The external skin is a mixture of traditional masonry / brick slips and aluminium cladding with large format windows to the south elevations and external balconies to the north elevation.


DPD Greengate

DPD Greengate - Chadderton


New distribution warehouse with associated offices & welfare facilities over 2 floors, comprising of steel frame construction & metal clad roof & walls.

Externals comprise of a lorry park, fuel station & van washing area.

Both staff & visitor parking facilities are to be provided as well as associated external works & landscaping.

The proposed tenant is DPD Ltd, the parcel distribution company.